James Hamilton Construction Co.James Hamilton Construction Co. Company OverviewJames Hamilton Construction Co. ServicesJames Hamilton Construction Co. CareersJames Hamilton Construction Co. Contact Us
James Hamilton Construction Co.

Projects Page

Current Projects

Corona

Status: current   Completion Date: Winter 2013

This NMDOT project is located on US 54 from Tularosa to Vaugh (Segment V of VII), in Lincoln & Torrance Co. Construction will consist of Roadway Reconstruction, pavement section, earthwork, metar barrier, concrete wall barrier, stuctures, bridge rehabilitation, signage and miscellaneous construction. Project Superintendent will be Jim Bauer and can be reached at 575-849-0013.


Bernardo

Status: current   Completion Date: Winter 2011

This NMDOT project is on I-25 from MP 174.80 to MP 187.00, located in Socorro & Valencia Co. Approximate lengh is 13 miles. Construction will consist of roadway rehabilitation with warm mix. Project Superintendent is Sterling Hamilton at 505-864-0675. 


Lumberton

Status: current   Completion Date: Spring 2012

This NMDOT project is on US 64 from MP 140 to MP 148.5, located in Rio Arriba County. The approximate length is 8.560 miles. Construction consist of Roadway Reconstruction pavement sections, roadway rehabilitaion, cold milling with overlay,  earthwork, metal barrier installiation, Concrete wall barrier, major stuctures, new bridge construction, etc... Thius contract must be completed in 340 working days. Project superintendent will be Jim Bauer at 575-756-1342.


Canal Street

Status: current   Completion Date: Spring 2012

This NMDOT Project is on US 6/180 MP 35.040 to MP 35.590 and on US 285 MP 33.262 to MP 34.612 located in Eddy County. The approximate lenght is 1.900 miles. Consrtuction Consists of Roadway Reconstruction, Pavement Sections (Flexable, Rigid), Eathwork (Borrow, Sunexcavation), Curb & gutter w/Sidewalk, Structures (Culverts, Drop Inlets, Manholes), Erosion Control Measures, Traffic Control (Phasing), Permanent Signing, Signalization, Lighting, ITS and Miscellaneous Construction. James Fields will be acting Project Superintendent. Contact information at (575) 887-0225.


Gary West

Status: current   Completion Date: Fall 2012

This NMDOT project is located in Hildago Co. on I-10, MP 15.450 to MP 20, appoximately 4.550 miles in length.  Construction will consist of Roadway Rehabilitation, Cold Milling w Inlay, Traffic Control and Miscellaneous Construction. This contract must be completed in 60 working days. Sterling Hamilton will be project supervisor and may be contacted at 505-864-0675.


Chino Mine

Status: current   Completion Date:
chino_drainage.jpg

The project office at the Freeport-McMoran Chino Mines site provides project work consisting of standing maintenance contracts and reclamation work. George Thacker/ Gerardo Chavez is the Project Supervisor and the project office is located at Hwy 152, MM 6, Santa Rita, NM. The office can be reached at 575-537-3361.


Arenas Valley Shop

Status: current   Completion Date:

The Arenas Valley Shop is the Company's main maintenance facility for equipment maintenance with a full range of mechanics, welders, and technicians. Equipment purchases, transport services for large equipment, as well as a storage facility for equipment and parts is also performed and/or housed at this facility. The Shop is located at 11781 Highway 180 East outside of Silver City, NM. Brian Richey is the Maintenance Superintendent and the office can be reached at 575-388-1927.


Tyrone Mining Company

Status: current   Completion Date:
Picture tyrone 003.jpg

The project office at the Freeport-McMoran Tyrone Mine site provides project work consisting of general earthwork contracts. George Thacker/ Tyler Brown is the Project Supervisor and the project office is located at 727 Mangus Valley Road, Tyrone, NM. The office can be reached at 575-388-2551.



Add This